Second Ground-Layer Wavefront Sensor Delivered! – October 2013

The second LINC-NIRVANA ground-layer wavefront sensor arrived at MPIA on 17 October. The whole operation went smoothly. In less than four hours, the sensor was unloaded, unpacked, and transported to the lab in the basement of the institute.

Unloading the ground-layer wavefront sensor from the shipping truck.

The slow and careful “funeral processioon” to transport the sensor to the lab.

Congratulations to the Padova Team for the excellent job they have done in building, testing, and delivering the second GWS!